About 2000 on October 9, 1993, an exp!osion occuned on board the 660-foot-long U.S. tankship OMI Charger, which was anchored in Bolivar Roads near Galveston, Texas. At the time of the explosion, a welder was making repairs to stop a small leak in the bulkhead between the port ballast and No. 5 port cargo tanks, about 14 feet below the main deck. The welder burned through the bulkhead, initiating an explosion in the No. 5 port cargo tank, which the ship's crew had not properly gas-freed. The welder and the firewatch, both of whom were inside the ballast tank, and the vessel's pumpman, who was working on deck near the No. 5 port cargo tank, were killed by the explosion. The vessel, valued at $12 million, was declared a constructive total loss.
We determined that the probable causes of the explosions and fire on the U.S. tankship OMI Charger were (1) the failure of the master and chief mate to follow prescribed company and industry guidance to ensure that the No. 5 port cargo tank was safe before permitting welding on the tank and (2) inadequate oversight by OMI Corporation and OMI Bulk Management Company, which allowed unsafe practices to develop over an extended period of time.
As a result of our investigation of this accident, we made the following recommendations:
--to the U.S. Coast Guard:
- Develop, in coordination with the Texas Departinent of Public Safety, a fire fighting contingency plan for the Galveston Bay area that ensures a rapid response with adequate fire fighting resources to a major shipboard fire. (M-94-46)
- Review existing fire contingency plans for all U.S. ports to ensure that these plans are complete and up-to-date by January 1996 and that they include, at a minimun, initial notification procedures, jurisdictional authorities, and identification of resources to be provided and actions to be taken by the Coast Guard, vessel operators, and the community. (M-94-47)
- Develop policy and guidelines to be used by the Captains of the Port in facilitating agreements between vessel owners and marine salvage firms for contracting fire fighting services. (M-94-48)
--to OMI Corporation and OMI Bulk Management Company:
- Implement an auditing program to ensure that corporate policy and guidance related to critical safety functions, including tank cleaning, tank testing, and tank entry, are followed aboard company vessels. (M-94-49)
- Develop a postaccident toxicological testing policy and procedures that include prearrangements designed to enhance collection of samples as soon as practicable following the occurrence of a serious marine incident. (M-94-50)
--to the National Fire Proection Association:
- Amend your publication NFPA 306 to include specific guidance about gas testing that is readily comprehesible by tank vessel operating personnel. (M-94-51)
To the Texas Department of Public Safety, Division of Emergency Managment: - Develop, in coordination with the U.S. Coast Guard, a fire fighting contingency plan for the Galveston Bay area that ensures a rapid response with adequate fire fighting resources to a major shipboard fire. (M-94-52)