On January 16, 2025, about 1850 local time, the towing vessels Tensaw and Albert were maneuvering two tank barges loaded with diesel oil into the Galveston Channel after departing Texas International Terminals in Galveston, Texas, when the Tensaw contacted two power transmission poles. Subsequently, the Albert contacted the terminal’s breakwater. There were no injuries, and no pollution was reported. There was no damage to the Tensaw or the two barges. Total damages to the Albert, power transmission poles, and breakwater were estimated at $1.1 million.
We determined that the probable cause of the contact of the towing vessel Tensaw with power transmission poles and the subsequent contact of the towing vessel Albert with the Texas International Terminals breakwater was the Albert and the Tensaw captains’ attempt to reconfigure the tow in the middle of a channel known to have strong tidal currents.
Planning Towing Maneuvers in Restricted Areas
Tidal currents can pose unique hazards for vessels working on or transiting in restricted areas such as harbors or channels. When planning towing operations in restricted waters, where immediate hazards (shallow water, traffic, fixed infrastructure) are present, mariners can ensure better outcomes by thoroughly assessing the impact of high currents and taking mitigating actions, such as changing departure times or using additional and more powerful assist vessels.