Safety Recommendation Details

Safety Recommendation A-93-031
Details
Synopsis: ON SUNDAY, MARCH 22, 1992, ABOUT 2135 EASTERN STANDARD TIME, A FOKKER 28-4000 (F-28), N485US, OPERATING AS USAIR FLIGHT 405, CRASHED DURING AN ATTEMPTED TAKEOFF FROM RUNWAY 13 AT LAGUARDIA AIRPORT, FLUSHING, NEW YORK. THE AIRPLANE WAS OPERATING UNDER TITLE 14, CODE OF FEDERAL REGULATIONS (CFR), PART 121, AS A SCHEDULED PASSENGER FLIGHT FROM JACKSONVILLE, FLORIDA, TO CLEVELAND, OHIO, WITH A STOPOVER AT LAGUARDIA AIRPORT. THERE WERE 47 PASSENGERS, 2 FLIGHTCREW MEMBERS AND 2 CABINCREW MEMBERS ON BOARD. THE CAPTAIN, ONE OF THE CABINCREW MEMBERS, AND 25 PASSENGERS RECEIVED FATAL INJURIES. IMPACT FORCES AND THE SUBSEQUENT FIRE DESTROYED THE AIRPLANE.
Recommendation: THE NTSB RECOMMENDS THAT THE PORT AUTHORITY: EXPEDITE THE REPLACEMENT OF THE EMERGENCY TELEPHONE SYSTEM BETWEEN THE AIR TRAFFIC CONTROL TOWER AND ARFF UNITS AT LAGUARDIA AIRPORT.
Original recommendation transmittal letter: PDF
Overall Status: Closed - Acceptable Action
Mode: Aviation
Location: FLUSHING, NY, United States
Is Reiterated: No
Is Hazmat: No
Is NPRM: No
Accident #: DCA92MA025
Accident Reports: Takeoff Stall in Icing Conditions USAIR Flight 405, FOKKER F-28, N485US
Report #: AAR-93-02
Accident Date: 3/22/1992
Issue Date: 3/18/1993
Date Closed: 1/24/1996
Addressee(s) and Addressee Status: Port Authority of New York and New Jersey (Closed - Acceptable Action)
Keyword(s):

Safety Recommendation History
From: NTSB
To: Port Authority of New York and New Jersey
Date: 1/24/1996
Response: THE BOARD NOTES THAT THE PORT AUTHORITY HAS UPGRADED THE EMERGENCY CONFERENCE LINE TELEPHONE SYSTEM AT LAGUARDIA. THEREFORE, THE BOARD CLASSIFIES A-93-31 "CLOSED--ACCEPTABLE ACTION."

From: Port Authority of New York and New Jersey
To: NTSB
Date: 11/29/1995
Response: THE PNY & NJ COMPLETED THE UPGRADING OF THE EMERGENCY CONFERENCE LINE TELEPHONE SYSTEM, THEREFORE A-93-31 SHOULD BE CLASSIFIED "CLOSED--ACCEPTABLE ACTION."

From: NTSB
To: Port Authority of New York and New Jersey
Date: 9/23/1994
Response: THE BOARD NOTES THAT THE PORT AUTHORITY HAS COMPLETED PHASE I OF THE UPGRADING OF THE EMERGENCY CONFERENCE LINE TELEPHONE SYSTEM AT LAGUARDIA, & ANTICIPATES COMPLETION OF THE FINAL PHASE 2 ON OR ABOUT 9/1/94. CONCERNING THE SUBMERGING OF THE PUMP STATIONS AT LAGUARDIA, THE PORT AUTHORITY BELIEVES THIS PROJECT CAN BE COMPLETED BY MARCH OF 1995. THE BOARD BELIEVES THE RESPONSE TO ITS RECOMMENDATIONS IS VERY TIMELY, CONSIDERING THE SCOPE OF THE TWO PROJECTS. PENDING COMPLETION OF THE PROJECTS, THE BOARD CLASSIFIES BOTH RECOMMENDATIONS "OPEN--ACCEPTABLE RESPONSE."

From: Port Authority of New York and New Jersey
To: NTSB
Date: 8/8/1994
Response: WITH RESPECT TO PUMP STATION #3, THE WORK REQUIRED TO SUBMERGE THE PUMP AS WELL AS RELOCATE THE ASSOCIATED ELECTRICAL EQUIPMENT IS BEING FINALIZED & WE EXPECT COMPLETION BY 10/1/94. AS YOU ARE AWARE FROM A PREVIOUS CORRESPONDENCE DATE 10/15/93, THE SUBMERSIBLE SYSTEMS; THEREFORE, REDESIGN OF THESE ELECTRICAL SYSTEMS WAS NECESSARY. THE CONTRACTS FOR PUMPS #1 AND #2 WERE AWARDED IN MARCH 1994 & WE EXPECT THIS WORK TO BE COMPLETED BY MARCH 1995. WITH RESPECT TO THE EMERGENCY CONFERENCE LINE TELEPHONE SYSTEM, THIS HAS BEEN BROKEN DOWN INTO TWO PHASES. DURING PHASE 1 OF THE INSTALLATION OF THE EMERGENCY ALERT NOTIFICATION SYSTEM, THE OLD SYSTEM WAS REPLACED WITH AN UPDATED STATE-OF-THE-ART COMMUNICATION SYSTEM CONNECTING THE FAA CONTROL TOWER AT LAGUARDIA AIRPORT TO VARIOUS PORT AUTHORITY UNITS & NEW YORK CITY EMERGENCY RESPONSE AGENCIES. THIS SYSTEM ALSO INCLUDES A BACKUP MASTER STATION UNIT WHICH CAN BE UTILIZED IF THE PRIMARY UNIT IN THE CONTROL TOWER SHOULD BECOME INOPERATIVE. PHASE 1 OF THE SYSTEM WAS PUT INTO OPERATION ON 2/25/94. ONCE PHASE 2 OF THE SYSTEM IS COMPLETED, THE SYSTEM WILL HAVE THE CAPABILITY OF PERFORM SELF-MONITORING & FAILURE REPORTING, REPEAT AN EMERGENCY ANNOUNCEMENT THREE TIMES, MAINTAIN A PRINTED LOG/RECORD OF EMERGENCY NOTIFICATION/LOCATION PICKUP RESPONSE, AS WELL AS DATE & TIME OF RECORD. COMPLETION OF PHASE 2 INSTALLATION IS SCHEDULED FOR ON OR ABOUT 9/1/94. THE FORMER SYSTEM WILL REMAIN CONNECTED FOR USE, IF NECESSARY UNTIL PHASE 2 IS COMPLETED TO THE PORT AUTHORITY'S SATISFACTION.

From: NTSB
To: Port Authority of New York and New Jersey
Date: 1/12/1994
Response: THE BOARD NOTES THAT THE SYSTEM WILL BE INSTALLED BY APRIL 1994, & THE BOARD WOULD APPRECIATE BEING NOTIFIED WHEN THE INSTALLATION IS COMPLETE. BASED ON THIS INFO, THE BOARD CLASSIFIES A-93-31 "OPEN--ACCEPTABLE RESPONSE."

From: Port Authority of New York and New Jersey
To: NTSB
Date: 10/15/1993
Response: DUE TO SOME UNFORESEEN CIRCUMSTANCE, THE FULL REPLACEMENT OF THE EMERGENCY CONFERENCE LINE TELEPHONE SYSTEM HAS BEEN DELAYED. HOWEVER, WORK IS UNDERWAY AND AS VARIOUS COMPONENTS BECOME AVAILABLE, THEY WILL BE PLACE ON LINE. THE SYSTEM WILL BE COMPLETELY INSTALLED BY APRIL 1994.

From: NTSB
To: Port Authority of New York and New Jersey
Date: 7/7/1993
Response: THE BOARD NOTES THAT THE PORT AUTHORITY WILL INSTALL A NEW EMERGENCY TELEPHONE SYSTEM AT LAGUARDIA AIRPORT AND EXPECTS INSTALLATION TO BE COMPLETED BY OCTOBER 1993. THE BOARD WOULD LIKE TO BE NOTIFIED WHEN THE NEW EMERGENCY TELEPHONE SYSTEM IS INSTALLED AND OPERATIONAL. PENDING NOTIFICATION, THE BOARD CLASSIFIES RECOMMENDATION A-93-31 "OPEN--ACCEPTABLE RESPONSE."

From: Port Authority of New York and New Jersey
To: NTSB
Date: 5/10/1993
Response: WE WILL BE ISSUING A REQUEST FOR PROPOSALS IN EARLY MAY TO INSTALL A NEW EMERGENCY TELEPHONE SYSTEM AT LAGUARDIA AIRPORT AS WELL AS AT JOHN F KENNEDY AND NEWARK INTERNATIONAL AIRPORTS. WE EXPECT INSTALLATION OF THE NEW SYSTEM AT LAGUARDIA AIRPORT TO BE COMPLETED BY OCTOBER, 1993. UNTIL THE NEW SYSTEM IS INSTALLED, OUR CURRENT SYSTEM CONTINUES TO BE FULLY OPERATIONAL AND PROVIDE SATISFACTORY EMERGENCY COMMUNICATIONS.