NTSB Number: HAR-88/02 NTIS Number: PB88-916202SYNOPSIS
The National Transportation Safety -Board determines that the-probable cause of the collapse of the Schoharie Creek Bridge was the failure of the New York State Thruway Authority to maintain adequate riprap around the bridge piers, which led to severe erosion in the soil beneath the spread footings. Contributing to the accident were ambiguous plans and specifications used for construction of the bridge, an inadequate NYSTA bridge inspection program, and inadequate oversight by the New York State Department of. Transportation and the Federal Highway Administration. Contributing to the severity of the accident was the lack of structural redundancy in the bridge.
The primary safety issues raised by this accident are the adequacy of the bridge design and construction, -the adequacy of the inspection and maintenance practices for this bridge, and the adequacy of the Federal/State oversight of private independent authorities. The report also evaluates-the adequacy of existing Federal Highway Administration/American Association of State Highway and Transportation Officials requirements for underwater inspections of scour.,
Recommendations have been made to the NYSTA, Federal Highway Administration, and the American Association of State Highway and Transportation Officials to correct deficiencies uncovered.